What Separates a Custom Park Building From a Catalog Building?

A park bathroom can seem like a tiny part of a massive project. Landscape engineers, architects and contractors may participate in the construction of one building.

Every transition asks a simple yet important question.

Who is responsible for ensuring that one stage connects to another in a proper manner?

This is a more valuable question than an inventory.

Image credit: romtec.com

Check out the Handoffs

Imagine a bathroom already conceptually designed. The dimensions are correct and the style of the outside is decided and everyone enjoys it.

Then engineering begins. The layout is impacted by a change that is required. This change influences a component specification, which influences the procurement. In the future, the contractor will find that the assumption made in design does not match the specifications provided.

None of these situations necessarily means someone made an error that was significant. These examples show how difficult it is to coordinate when the responsibility is split across multiple individuals.

A best park building designer candidate should therefore be evaluated on more than creativity. Knowing the codes, accessibility requirements components, engineering documentation, and construction realities can aid in connecting design choices with the building that is ultimately constructed.

Find out what the proposal actually Doesn’t Include

Two plans for supposedly similar structures may have different scopes.

The first could be the construction package. It could include preliminary design support and sketches, renderings and engineered plans.

Comparing only the bottom-line price without understanding those differences can create a misleading comparison.

Romtec can provide you with free preliminary designs and estimations and drawings, specifications and renderings to accompany your bid package. After acceptance the process can move on to engineered plan sets and complete submissions.

This gives owners and designers an easier path to take an idea to a structure that is built.

You Need to Get Your Custom Orders as early as possible.

Rarely, public projects are carried out under the same conditions.

A community might want to use eco-friendly fixtures and materials. Others may have a distinct architectural style. Landscape architects may need unusual colors or siding to visually link the restroom to other park structures.

These decisions can influence more than appearance. They could affect components, documentation purchasing, engineering and construction.

Addressing specific requirements in the beginning gives the team working on the project an opportunity to incorporate them intentionally rather than trying to make them retrofitable once major decisions have been made.

Construction Knowledge Modifies the Design Conversation

The ideal park bathroom builder for a particular project needs to recognize that a drawing eventually has to become physical structure.

Romtec is a firm that designs, manufactures, equipment and constructs buildings to be used by the public. It can provide turnkey installations, or building packages that are part of larger construction projects.

That design-to-construction experience creates a practical perspective: decisions made at a desk eventually have consequences on a jobsite.

Don’t just look at the destination alone, but also the journey

A bathroom that is finished doesn’t show the whole coordination that occurred prior to opening day.

Park owners can see the building. Visitors look at the structure. However, the project team is exposed to all the steps that preceded the design decision, estimates documents, engineering approvals, supplies, and construction.

This is why selecting a park-building partner shouldn’t start and end with asking “Do we like their facilities?”

A more useful question is:

Could you assist us in take the building that was in our imagination to a building which is accessible to the public?

Recent Post

Top Category

Scroll to Top